_core_eia860__cooling_equipment

package: pudl

Information about cooling equipment at generation facilities.

Most-recent data:

2024

Processing:

Data has been cleaned but not tidied/normalized. Published only temporarily and may be removed without notice.

Source:

EIA Form 860 -- Annual Electric Generator Report (Schedule 6D)

Primary key:

plant_id_eia, utility_id_eia, cooling_id_eia, report_date

Usage Warnings

  • This table has not been harvested with other EIA 923 or 860 data. The same variables present in this table may show up in other _core tables in other years.

Additional Details

A single plant can have several collections of cooling equipment, so each line in this table represents one cooling system at a given plant. You can determine how to link each set of cooling equipment to specific boilers in a plant via core_eia860__assn_boiler_cooling.

EIA-860 respondents are required to submit information about cooling equipment for plants over 100 MW - including steam, combined cycle, nuclear or solar thermal generators.

This table has been cleaned, but not tidied/normalized with other EIA 923 or 860 data. The same variables present in this table may show up in other tables and/or in other years. Once this table has been harvested, it will be converted into a``core`` table.

Columns
report_date

Date reported.

plant_id_eia

The unique six-digit facility identification number, also called an ORISPL, assigned by the Energy Information Administration.

plant_name_eia

Plant name.

cooling_id_eia

EIA Identification code for cooling system (if multiple cooling systems are not distinguished by separate IDs, the word 'PLANT' is listed to encompass the cooling system for the entire plant)

utility_id_eia

The EIA Utility Identification number.

utility_name_eia

The name of the utility.

county

County name.

state

Two letter US state abbreviation.

chlorine_equipment_cost

Actual installed cost for the existing chlorine discharge control system or the anticipated cost to bring the chlorine discharge control system into commercial operation

chlorine_equipment_operating_date

Actual or projected in-service date for chlorine discharge control structures and equipment

cooling_equipment_total_cost

Actual installed cost for the existing system or the anticipated cost to bring the total system into commercial operation

cooling_status_code

Operating status of cooling system

cooling_system_operating_date

The actual or projected in-service datetime of this cooling system

cooling_type_1

Type of cooling system

cooling_type_2

Type of cooling system

cooling_type_3

Type of cooling system

cooling_type_4

Type of cooling system

cooling_water_discharge

Name of river, lake, or water source that cooling water is discharged into

cooling_water_source

Name of river, lake, or water source that provides cooling water

intake_distance_shore_feet

Maximum distance from shore to intake

intake_distance_surface_feet

Average distance below water surface to intake

intake_rate_100pct_gallons_per_minute

Design cooling water flow rate at 100 percent load at in-take

outlet_distance_shore_feet

Maximum distance from shore to outlet

outlet_distance_surface_feet

Average distance below water surface to outlet

percent_dry_cooling

Percent of cooling load served by dry cooling components

plant_summer_capacity_mw

The plant summer capacity associated with the operating generators at the plant

pond_cost

Actual installed cost for the existing cooling ponds or the anticipated cost to bring the cooling ponds into commercial operation

pond_operating_date

Cooling ponds actual or projected in-service date

pond_surface_area_acres

Total surface area of cooling pond

pond_volume_acre_feet

Total volume of water in cooling pond

power_requirement_mw

Maximum power requirement for cooling towers at 100 percent load

steam_plant_type_code

Code that describes types of steam plants from EIA 860. See steam_plant_types_eia table for more details.

tower_cost

Actual installed cost for the existing cooling towers or the anticipated cost to bring the cooling towers into commercial operation

tower_operating_date

Cooling towers actual or projected in-service date

tower_type_1

Types of cooling towers at this plant

tower_type_2

Types of cooling towers at this plant

tower_type_3

Types of cooling towers at this plant

tower_type_4

Types of cooling towers at this plant

tower_water_rate_100pct_gallons_per_minute

Maximum design rate of water flow at 100 percent load for the cooling towers

water_source_code

Type of cooling water source

water_source

Name of water source associated with the plant.

water_type_code

Type of cooling water