_core_eia860__fgd_equipment
Return to SearchInformation about flue gas desulfurization equipment at generation facilities.
- Most-recent data:
2024
- Processing:
Data has been cleaned but not tidied/normalized. Published only temporarily and may be removed without notice.
- Source:
EIA Form 860 -- Annual Electric Generator Report (Schedule 6E)
- Primary key:
plant_id_eia, so2_control_id_eia, report_date
Usage Warnings
This table has not been harvested with other EIA 923 or 860 data. The same variables present in this table may show up in other _core tables in other years.
Columns
Date reported.
The unique six-digit facility identification number, also called an ORISPL, assigned by the Energy Information Administration.
Sulfur dioxide control identification number. This ID is not a unique identifier.
The EIA Utility Identification number.
The name of the utility.
Two letter US state abbreviation.
Two digit state FIPS code.
County name.
County ID from the Federal Information Processing Standard Publication 6-4.
The actual or projected in-service datetime of this flue gas desulfurization system
Operating status code for flue gas desulfurization equipment.
Indicates whether flue gas can bypass the flue gas desulfurization unit.
Is saleable byproduct recovered by the unit?
Indicates if there is a sludge pond associated with this unit.
Indicates whether the sludge pond is lined.
Annual pond and land fill requirements for flue gas desulfurization equipment.
Actual installed costs for the existing systems or the anticipated costs of structures and equipment to bring a planned flue gas desulfurization system into commercial operation.
Other actual installed costs for installation of a flue gas desulfurization unit or the anticipated other costs pertaining to the installation of a flue gas desulfurization unit.
Actual installed costs for the existing sludge transport and disposal systems or the anticipated costs of sludge transport and disposal systems to bring a planned system into commercial operation.
Total actual installed costs for the existing flue gas desulfurization unit or the anticipated costs to bring a planned flue gas desulfurization unit into commercial operation.
Total number of flue gas desulfurization unit scrubber trains operated at 100 percent load.
Total number of flue gas desulfurization unit scrubber trains.
Ratio of all flue gas that is entering the flue gas desulfurization unit.
Actual flue gas exit rate, in cubic feet per minute.
Flue gas exit temperature, in degrees Fahrenheit.
Sulfur dioxide emission rate when operating at 100 percent load (pounds per hour).
Type of sulfur dioxide control equipment.
Type of sulfur dioxide control equipment.
Type of sulfur dioxide control equipment.
Type of sulfur dioxide control equipment.
Designed removal efficiency for sulfur dioxide when operating at 100 percent load. Reported at the nearest 0.1 percent by weight of gases removed from the flue gas.
Design fuel specifications for ash when burning coal or petroleum coke (nearest 0.1 percent by weight).
Design fuel specifications for sulfur when burning coal or petroleum coke (nearest 0.1 percent by weight).
Type of sorbent used by this sulfur dioxide control equipment.
Type of sorbent used by this sulfur dioxide control equipment.
Type of sorbent used by this sulfur dioxide control equipment.
Type of sorbent used by this sulfur dioxide control equipment.
Name of flue gas desulfurization equipment manufacturer.
Code corresponding to name of flue gas desulfurization equipment manufacturer.
Code that describes types of steam plants from EIA 860. See steam_plant_types_eia table for more details.
The plant summer capacity associated with the operating generators at the plant
Name of water source associated with the plant.
Maturity of the source data published by EIA that is reflected in this record. EIA releases data incrementally over time, including monthly updates, annual year-to-date updates, provisional early releases of annual data, and final annual release data that is not expected to change further. Records sourced from multiple upstream EIA datasets may have no well defined data maturity. Records whose values have been inferred within PUDL will also have no data maturity.